The National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ) requires that a Stormwater Pollution Prevention Plan (SWPPP) be prepared for any construction or demolition activity that results in a land disturbance of equal to or greater than one (1) acre. To obtain coverage under the General Permit, Permit Registration Documents (PRDs), which include a Notice of Intent (NOI), SWPPP, and other documents required by the General Permit must be submitted to the State Water Resources Control Board.
Condor's Qualified SWPPP Developers (QSDs) are available to assist with any construction project in the preparation and submittal of the PRDs and in the development of project-specific, cost effective Best Management Practices (BMPs). Condor has provided construction SWPPP services since 1999 for major agricultural and grading projects throughout California.
Condor's construction stormwater compliance services include:
It was great working with your staff. From field technicians to office clerks, all were helpful, professional, and friendly. Good job!
— Soulsbyville School District